Maintenance and Management Activities of Industrial Waste Treatment
We established an industrial waste incineration facility within Befu Works to dispose of a portion of the industrial waste (waste oil, waste acid, and waste alkali) generated on-site, thereby reducing the weight of waste.
Overview of the Industrial Waste Incineration Facility
Location |
346-1 Miyanishi, Harima-cho, Kako-gun, Hyogo (within Befu Works) |
---|---|
Date of establishment |
February 15, 1989 |
Type and treatment method of the facility |
Incineration facility (submerged combustion system) |
Types of industrial waste to be treated |
Waste oil, waste acid, waste alkali |
Treatment capacity and operation time |
500kg/hour, 24 hours/day |
Structure and equipment installed |
Reinforced concrete floor, vertical submerged combustion furnace, mist separator, gas filter, venturi scrubber |